A 240-plot residential development delivered as a multi-phase facing-brickwork package for Barratt. At peak we ran up to six gangs on site, holding NHBC-standard workmanship across every plot while tracking a tight build programme.
Housing Development, Warwick
Residential · Bricklaying Package
Client
Barratt
Value / Scope
£3.2m package
Programme
4 phases · 30 months
Location
Warwick
Overview
Gallery
Volume housing brickwork, delivered on programme
What we did
- Facing brickwork & blockwork — 240 plots
- Gable ends, chimneys & feature panels
- Boundary & garden walling
- Full-time site supervision & QA
- Phased delivery to the build programme
The challenge
Multiple house types running concurrently on a weather-exposed site meant quality had to stay consistent plot to plot while output ramped across four phases.
The outcome
Every phase was handed over on or ahead of programme with zero brickwork-related NHBC issues — and the framework was extended onto a second Barratt development.
On site
Reliable gangs, quality workmanship, and programmes hit every time.
Site Director · Barratt
Planning something similar?
Tell us about your project and we'll come back within two working days.
GET A QUOTEor call 01926 311595